メインコンテンツまでスキップ

Overview

It is possible to set the parameters for your effects in a special window (for example: the power of a blur, the luminosity of the animated footage, the speed of a fade…). This window is called the FX Stack.

You call up the FX Stack by clicking on the FX icon in the tool bar or by selecting FX Stack in the Windows > FX Tools main menu:

The FX Stack Icon

The FX Stack Panel

Load the Palette project. Spread the Layer over thirty images. Here is what your Timeline and Canvas should look like:

The Palette Project

Palette with no FX

Our FX Stack is currently empty. Select the effect Stylize > Mosaic from the menu. The FX Stack should then look like this:

The Mosaic FX

Now modify the Width and Height settings by adjusting their values to 20 and 30.

The result is immediately visible on the current image: the image is cut in blocks of 20 pixels in width and 30 pixels in height (the color of a block is equal to the average of the pixels making up the block in the original image). The Smooth button enables blending between adjacent blocks, the image obtained is therefore closer to the original image.

Palette with Mosaic FX

That said, the right image above is, in fact, for the moment only the preview of our Mosaic effect (disabling the Preview button allows you to return to the original image).

To validate your settings and apply them into the current Layer, all you have to do is apply your effect : click on the Apply FX Stack button at the bottom of the FX Stack window. Your current Layer will be modified according to your settings (if required, use the Undo option to undo the modification). Don't forget that all images of the Layer must be selected if required.